Product / Regulatory room
Meridian
Regulatory work, mapped: requirements matched to evidence, gaps surfaced before the submission goes out.
Live hub · Regulatory room
Requirement mapping · SBP EMI Regs 2019
Reg 5 · Licensing scope
Reg 7 · Safeguarding of funds
Reg 9 · Customer protection
Submission readiness
Gaps are shown before the answer, not discovered by the regulator.
The question it answers
“Can we expand a product while our evidence file still has licensing and customer-protection gaps?”
What it does
- Requirement mapping. each obligation is matched to the evidence that satisfies it.
- Gap surfacing. missing or thin evidence is flagged before a submission, not after.
- Jurisdiction awareness. scope is flagged before the answer; nothing is assumed from the question.
The boundary
Meridian prepares and evidences. A named human decides. Nothing consequential leaves the system without an identity-bound approval step.